Bio-HyPP

Financiado
Biogas fired Combined Hybrid Heat and Power Plant
To reach the goals of improving the efficiency of CHP systems while simultaneously widening the biomass feedstock base as well as increasing operational flexibility, the project aims to develop a full scale technology demonstrator... To reach the goals of improving the efficiency of CHP systems while simultaneously widening the biomass feedstock base as well as increasing operational flexibility, the project aims to develop a full scale technology demonstrator of a hybrid power plant using biogas as main fuel in lab environment. A combined hybrid heat and power plant combines a micro gas turbine (MGT) and a solid oxide fuel cell (SOFC). The focus of the technology demonstration plant is to prove the functional capability of the plant concept, followed by detailed characterization and optimization of the integration of both subsystems. The main objective is to move the technology beyond the state of the art to TRL 4. Electrical efficiencies of more than 60% and total thermal efficiencies of more than 90% are intended to reach at base load conditions. An operational flexibility ranging from 25% to 100% electric power should be achieved. The emission levels should not exceed 10 ppm NOx and 20 ppm CO (at 15% vol. residual oxygen). The system should allow the use of biogas with methane contents varying from 40-75%, thus covering the biogas qualities from the fermentation of the entire biomass feedstock range. To achieve the objectives the subsystems MGT and SOFC including their subcomponents have to be adjusted and optimized by a multidisciplinary design approach using numerical and experimental measures to ensure a proper balance of plant. In addition an integrated control system has to be developed and implemented to achieve a reliable operation of the coupled subsystems. A detailed analysis of different European markets, economic and technical constraints in terms of biogas production potentials will clarify the regional suitable sizes and attractive performance conditions of the power plant system. To identify cost reduction potentials a thermo-economic analysis will be performed. Here, an internal rate of return (IRR) of the system of higher than 15% should be achieved over a 20 years. ver más
31/12/2019
DLR
6M€
Duración del proyecto: 55 meses Fecha Inicio: 2015-05-20
Fecha Fin: 2019-12-31

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2019-12-31
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 6M€
Líder del proyecto
DEUTSCHES ZENTRUM FUR LUFT UND RAUMFAHRT EV No se ha especificado una descripción o un objeto social para esta compañía.
Perfil tecnológico TRL 4-5