Innovating Works

ASTEP

Financiado
Application of Solar Thermal Energy to Processes
Application of Solar Thermal Energy to Processes (ASTEP) will create a new innovative Solar Heating for Industrial Processes (SHIP) concept focused on overcoming the current limitations of these systems. This solution is based on... Application of Solar Thermal Energy to Processes (ASTEP) will create a new innovative Solar Heating for Industrial Processes (SHIP) concept focused on overcoming the current limitations of these systems. This solution is based on modular and flexible integration of two innovative designs for the solar collector (SunDial) and the Thermal Energy Storage (TES, based on Phase Change Materials, PCM) integrated via a control system which will allow flexible operation to maintain continuous service against the unpredictable nature of the solar source and partially during night operation. ASTEP will demonstrate its capability to cover a substantial part of the heat demand of the process industry at temperatures above 150 ºC and for latitudes where current designs are not able to supply it. Its modularity and compactness will also enable easy installation and repair with reduced space requirements, while most of components can be sourced locally. The ASTEP`s process integration will allow full compatibility with the existing systems of potential end-users of SHIP. These aspects will provide a very competitive solution to substitute fossil fuel consumption. The developed solar concept will be tested at two industrial sites to prove the objective’s target of TRL5. Life Cycle Analysis will be included to validate and demonstrate the efficiency of the proposed technologies. The first Industrial Site of the proposal is the world’s leading steel company, ArcelorMittal, with a heating demand above 220 ºC for a factory located at a latitude of 47.1 N (Iasi, Romania). The second site is the dairy company MANDREKAS, located at a latitude of 37.93 N (Corinth, Greece) with a heating demand for steam at 175 ºC and a cooling demand at 5 ºC. These test locations will validate the ASTEP solution for a substantial part of the potential requirements of industrial heating and cooling demand of the European Union (EU28), which is estimated at approximately 72 TWh per year ver más
30/06/2025
5M€
Duración del proyecto: 62 meses Fecha Inicio: 2020-04-17
Fecha Fin: 2025-06-30

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2020-04-17
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 5M€
Líder del proyecto
UNIVERSIDAD NACIONAL DE EDUCACIÓN A DISTANCIA No se ha especificado una descripción o un objeto social para esta compañía.
Total investigadores 916