Innovating Works

ANTICIPATE

Financiado
Absorb Nearby Tidy Identified Candidates for Ideal Parteking Available Temporal...
Absorb Nearby Tidy Identified Candidates for Ideal Parteking Available Temporal Extra capacity "Besides the Air Traffic Flow and Control Management (ATFCM) benefits achieved through the implementation of STAM mechanisms, the fast pace time-variant dynamic characteristics of traffic during the execution phase cannot be count... "Besides the Air Traffic Flow and Control Management (ATFCM) benefits achieved through the implementation of STAM mechanisms, the fast pace time-variant dynamic characteristics of traffic during the execution phase cannot be counterbalanced by the rigidity (technical, staff or set-up time requirements) of low pace airspace capacity mechanisms diming the possibility to implement efficient and effective capacity-on-demand measures where and when they are needed. ANTICIPATE aims to extend pre-tactical and tactical ATFCM STAM with a ""capacity-on-demand"" efficient and effective mechanism to benefit of the networking airspace capacity by a fine tuning distribution of workload among adjacent sector ATCos at execution phase. It aims to avoid the unnecessary regulations on the traffic demand on the day of operation while mitigating present latent capacity inherent to a fragmented management of sectors through a network-minded management of time-stamp perishable mobile areas among sectors. Present proposal rely on the ATM digitalization and the Virtual Centres to enhance present STAM mechanisms with capacity-on-demand measures at operational level, paving the way to new airspace capacity management mechanism considering the constant increment on traffic demand through the pairwise adjacent-sector balancing mechanism to longer adjacent-sector chains." ver más
28/02/2027
Líder desconocido
1M€
Duración del proyecto: 32 meses Fecha Inicio: 2024-06-28
Fecha Fin: 2027-02-28

Línea de financiación: concedida

El organismo HORIZON EUROPE notifico la concesión del proyecto el día 2024-06-28
Presupuesto El presupuesto total del proyecto asciende a 1M€
Líder del proyecto Líder desconocido