A novel and versatile 3 tower maritime structure for the cost efficient installa...
A novel and versatile 3 tower maritime structure for the cost efficient installation of all sizes offshore wind turbines.
The TRIWIND project is the result of a project initiated by Berenguer Ingenieros one year ago, which has resulted in a patented technology (application number: P201631043) for the cost-efficient installation of offshore wind farms...
ver más
BERENGUER INGENIEROS
La realizacion de toda clase de informes, estudios. proyectos. asesoria y gestion administrativa en los campos de ingenieria civil, de la ar...
TRL
4-5
| 174K€
Fecha límite participación
Sin fecha límite de participación.
Financiación
concedida
El organismo H2020 notifico la concesión del proyecto
el día 2017-10-31
¿Tienes un proyecto y buscas un partner? Gracias a nuestro motor inteligente podemos recomendarte los mejores socios y ponerte en contacto con ellos. Te lo explicamos en este video
MARE-WINT
new MAterials and REliability in offshore WINd Turbines tech...
4M€
Cerrado
X1 ACCELERATOR
Accelerating the implemention of X1 Wind disruptive floating...
4M€
Cerrado
HIPRWIND
High Power high Reliability offshore wind technology
18M€
Cerrado
SATH
New twin floating platform for offshore wind turbines
3M€
Cerrado
RELIAWIND
Reliability focused research on optimizing Wind Energy syste...
8M€
Cerrado
Información proyecto TRIWIND
Duración del proyecto: 5 meses
Fecha Inicio: 2017-05-01
Fecha Fin: 2017-10-31
Líder del proyecto
BERENGUER INGENIEROS
La realizacion de toda clase de informes, estudios. proyectos. asesoria y gestion administrativa en los campos de ingenieria civil, de la ar...
TRL
4-5
| 174K€
Presupuesto del proyecto
71K€
Fecha límite de participación
Sin fecha límite de participación.
Descripción del proyecto
The TRIWIND project is the result of a project initiated by Berenguer Ingenieros one year ago, which has resulted in a patented technology (application number: P201631043) for the cost-efficient installation of offshore wind farms. Following the R&D stage already accomplished and the patent application, the ultimate goal we seek in the project is to complete the prototyping stage and testing studies to reach its commercial appetite and value for leading companies of the wind energy sector such as Siemens and MHI Vestas, which account for more than 80% of the wind turbine manufacturers market share only in Europe.
This is an innovative foundation solution for offshore wind turbines that directly impacts on (1) production costs reducing on circa 30%; (2) on transportation (self-buoyant) and installation (self-installed) with a combined costs savings of 86.5% and operational average time reduction from 12-20h to 3h and; (3) it also affects on the decommissioning phase by 50% reduction. All these costs savings represent circa 16.7% of the total costs of an offshore wind turbine life-cycle. Other crucial aspects are related to structure’s duration extension and less maintenance requirements, technical and operational easiness in all previous phases along with health and safety improvements.
For this phase 1, we will perform a feasibility study including: (1) technical feasibility, 2) operational/financial feasibility and 3) commercial feasibility.