ExpectedOutcome:Project results are expected to contribute to the following expected outcome: Demonstration of increased energy system reliability and resilience, preventing or ensuring rapid recovery following disturbances such as faults, cyberattacks, terrorism or similar at all relevant levels (infrastructure, hardware, software, organisational, etc.).
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos:

ExpectedOutcome:Project results are expected to contribute to the following expected outcome: Demonstration of increased energy system reliability and resilience, preventing or ensuring rapid recovery following disturbances such as faults, cyberattacks, terrorism or similar at all relevant levels (infrastructure, hardware, software, organisational, etc.).


Scope:Proposals are expected to include all of the following 4 points:

Demonstration of measures to minimize TSO and DSO risks, vulnerabilities and of priority strategies and measures against nature and man-made hazards, terrorism, climate-related extreme events, weather, migration, etc. for: substation systems security and design; HV, MV, LV grid infrastructures including platforms for TSO and DSO interaction; automatic control of decentralized flexibility solutions; Events resulting in cascading failures, their mitigation and prevention. Application of advanced information technologies (e.g. probabilistic safety assessment, quantitative risk analysis) in system development, operation and asset management.Application of digital technologies for ensuring operational data quality and demand... ver más

ExpectedOutcome:Project results are expected to contribute to the following expected outcome: Demonstration of increased energy system reliability and resilience, preventing or ensuring rapid recovery following disturbances such as faults, cyberattacks, terrorism or similar at all relevant levels (infrastructure, hardware, software, organisational, etc.).


Scope:Proposals are expected to include all of the following 4 points:

Demonstration of measures to minimize TSO and DSO risks, vulnerabilities and of priority strategies and measures against nature and man-made hazards, terrorism, climate-related extreme events, weather, migration, etc. for: substation systems security and design; HV, MV, LV grid infrastructures including platforms for TSO and DSO interaction; automatic control of decentralized flexibility solutions; Events resulting in cascading failures, their mitigation and prevention. Application of advanced information technologies (e.g. probabilistic safety assessment, quantitative risk analysis) in system development, operation and asset management.Application of digital technologies for ensuring operational data quality and demand patterns recognition improving data access and information acquisition for maintenance operators.Development of shared knowledge basis within European area concerning threats, vulnerabilities, methods, not only for components but for entire systems and energy system technologies. From the following four, proposals should include at least two:

Development and application of technology (e.g. blockchain) for the identification and authentication of energy IoT devices, authentication of origin in spare part management, trading certificate infrastructures, protection relay configuration and micro grid management.Development, testing and demonstration of advanced intrusion detection and prevention systems for energy infrastructures including security-related data and deep learning methods.Dedicated strategies for enhanced security and resilience at DSO and TSO level, including demonstration of TSO/DSO security data sharing.Development and application of methodologies for automation of grid maintenance (for example through robotics), advanced human-machine interfaces, and of data validation processes automation by applying emerging technologies. The selected projects are expected to contribute to relevant BRIDGE[1] activities.


Specific Topic Conditions:Activities are expected to achieve TRL 5-6 by the end of the project – see General Annex B.




Cross-cutting Priorities:Digital AgendaArtificial Intelligence


[1]https://www.h2020-bridge.eu/

ver menos

Temáticas Obligatorias del proyecto: Temática principal: Digital Agenda Artificial Intelligence Electrical engineering Electronic engineering In Energy fuels and petroleum engineering

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: ExpectedOutcome:Project results are expected to contribute to the following expected outcome: Demonstration of increased energy system reliability and resilience, preventing or ensuring rapid recovery following disturbances such as faults, cyberattacks, terrorism or similar at all relevant levels (infrastructure, hardware, software, organisational, etc.). ExpectedOutcome:Project results are expected to contribute to the following expected outcome: Demonstration of increased energy system reliability and resilience, preventing or ensuring rapid recovery following disturbances such as faults, cyberattacks, terrorism or similar at all relevant levels (infrastructure, hardware, software, organisational, etc.).
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Gastos relacionados con el personal que trabaja directamente en el proyecto basado en las horas efectivas dedicadas, basado en el coste empresa y ratios fijos para determinados empleados como los dueños de la compañía.
Subcontracting costs.
Pagos a terceros externos para realizar tareas específicas que no pueden ser realizadas por los beneficiarios del proyecto.
Purchase costs.
Incluyen la adquisición de equipos, amortizaciones, material, licencias u otros bienes y servicios necesarios para la ejecución del proyecto
Other cost categories.
Gastos diversos como costes financieros, certificados de auditoría o participación en eventos no cubiertos por otras categorías
Indirect costs.
Gastos generales no asignables directamente al proyecto (como electricidad, alquiler u oficina), calculados como un 25% fijo sobre los costes directos elegibles (excepto subcontratación).
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 6:. Se cuenta con prototipos piloto capaces de desarrollar todas las funciones necesarias dentro de un sistema determinado, habiendo superado pruebas de factibilidad en condiciones de operación o funcionamiento real. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Para el presupuesto subvencionable la intensidad de la ayuda en formato fondo perdido podrá alcanzar desde un 70% hasta un 100%.
The funding rate for IA projects is 70 % for profit-making legal entities and 100 % for non-profit legal entities. The funding rate for IA projects is 70 % for profit-making legal entities and 100 % for non-profit legal entities.
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda no tiene efecto incentivador. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
HORIZON-CL5-2021-D3-02 Reliability and resilience of the grid: Measures for vulnerabilities, failures, risks and privacy ExpectedOutcome:Project results are expected to contribute to the following expected outcome: Demonstration of increased energy system relia...
Sin info.
HORIZON-CL5-2021-D3-01-03 Establish the grounds for a common European energy data space
en consorcio: ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes: Higher degree of interoperability bet...
Cerrada hace 8 meses | Próxima convocatoria prevista para el mes de
HORIZON-CL5-2021-D3-01-03 Clean Energy Transition
en consorcio:
Cerrada hace 8 meses | Próxima convocatoria prevista para el mes de
HORIZON-CL5-2021-D3-01-03 Clean Energy Transition
en consorcio: ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes: Ensure continuity of the ongoing inte...
Cerrada hace 1 año | Próxima convocatoria prevista para el mes de
HORIZON-CL5-2021-D3-01-03 Clean Energy Transition
en consorcio: ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes: Ensure continuity of the ongoing inte...
Cerrada hace 1 año | Próxima convocatoria prevista para el mes de
HORIZON-CL5-2021-D3-03-04 Physics and aerodynamics of atmospheric flow of wind for power production
en consorcio: Expected Outcome:As wind turbines grow bigger and taller, the blade tips are increasing more affected by turbulent atmospheric flow features...
Cerrada hace 3 años | Próxima convocatoria prevista para el mes de