Innovating Works
HORIZON-CL5-2023-D3-01-02
PV integration in buildings and in infrastructure
Expected Outcome:Photovoltaic products are considered to be building-integrated, if they have been designed following the basic requirements for construction works in order to form and/or replace a construction product. If the integrated PV product is dismounted, it would have to be replaced by an appropriate conventional construction product. Building and infrastructure integrated PV can be a cost-effective, technologically proven solution to decarbonise buildings and infrastructure.
Sólo fondo perdido 0 €
European
This call is closed Esta línea ya está cerrada por lo que no puedes aplicar.
An upcoming call for this aid is expected, the exact start date of call is not yet clear.
Presentation: Consortium Consortium: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Minimum number of participants.
This aid finances Proyectos:

Expected Outcome:Photovoltaic products are considered to be building-integrated, if they have been designed following the basic requirements for construction works in order to form and/or replace a construction product. If the integrated PV product is dismounted, it would have to be replaced by an appropriate conventional construction product. Building and infrastructure integrated PV can be a cost-effective, technologically proven solution to decarbonise buildings and infrastructure.

Consequently, project results are expected to contribute to all of the following expected outcomes:

Demonstrate economic and sustainable integration of PV products in the built environment and in infrastructure.Establish enhanced structural collaborative innovation between PV companies and the (building) construction sector.Contribute to the Renovation Wave, the Mission on climate-neutral and smart Cities and the New European Bauhaus initiative. Scope:PV integration in buildings and in infrastructure unlocks a huge potential for renewable electricity generation. Integrated PV require individual solutions in order to meet multi-functional and aesthetic requirements such as y... see more

Expected Outcome:Photovoltaic products are considered to be building-integrated, if they have been designed following the basic requirements for construction works in order to form and/or replace a construction product. If the integrated PV product is dismounted, it would have to be replaced by an appropriate conventional construction product. Building and infrastructure integrated PV can be a cost-effective, technologically proven solution to decarbonise buildings and infrastructure.

Consequently, project results are expected to contribute to all of the following expected outcomes:

Demonstrate economic and sustainable integration of PV products in the built environment and in infrastructure.Establish enhanced structural collaborative innovation between PV companies and the (building) construction sector.Contribute to the Renovation Wave, the Mission on climate-neutral and smart Cities and the New European Bauhaus initiative. Scope:PV integration in buildings and in infrastructure unlocks a huge potential for renewable electricity generation. Integrated PV require individual solutions in order to meet multi-functional and aesthetic requirements such as yield-friendly colouring or modular transparency, antifouling property, structural flexibility, module lightness and flexibility, suited voltage levels, the use of and combination with (building) materials other than glass, and an overall high aesthetical value that addresses the requirements of architects and designers.

Proposals are expected to:

Demonstrate resilience against partial shading, flexibility in the interconnection of PV modules having different sizes and electrical characteristics specific optical and thermal control solutions, long service life/easy replacement, safety and simplicity of maintenance, software control for quick detection of faults, module substructures and fixing systems to enhance aesthetics and functionality of the integration and electricity yield.Decrease costs and enhance lifetime, quality, reliability and sustainability with new approaches for both PV module and BOS with the development of industrialized production of customized products and of prefabricated modular solutions, which incorporate an integrated life cycle approach.Develop energy integration and social behaviour concepts to maximize the energy matching between PV production and local buildings consumption, supported by new tools and business models to ensure their economic effectiveness.Demonstrate integration of PV design and manufacturing within the construction value chain with appropriate consideration to standards for buildings and infrastructure, as well as contribution to new and improved standards. Form alliances between all stakeholders (PV and building/construction sectors, distribution system operators, investors, owners, architects, installers) to tackle a number of educational and regulatory barriers that still hinder the development of integrated PV in buildings and in infrastructure. The goal is to promote new concepts/schemes and business models for an active role of integrated PV in renovation and construction. Demonstrations are expected to be carried out in more than one different construction typologies (residential buildings, tertiary building [hospitals, schools, public administration buildings, etc.]), or civil infrastructures (roadways, noise barriers, parking lots, bridges, etc.) and in more than one location in Europe.

A plan for the exploitation and dissemination of results should include a strong business case and sound exploitation strategy, as outlined in the introduction to this Destination. The exploitation plan should include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan) indicating the possible funding sources to be potentially used (in particular the Innovation Fund).

Projects are expected to contribute to the New European Bauhaus (NEB) initiative[1] by interacting with the NEB Community, NEBLab and other relevant actions of the NEB initiative through sharing information, best practice, and, where relevant, results.

[1] https://europa.eu/new-european-bauhaus/index_en

see less

Temáticas Obligatorias del proyecto: Temática principal: Photovoltaics Renewable energy sources - general

Consortium characteristics

Scope European : The aid is European, you can apply to this line any company that is part of the European Community.
Tipo y tamaño de organizaciones: The necessary consortium design for the processing of this aid needs:

characteristics of the Proyecto

Requisitos de diseño por participante: Duración:
Requisitos técnicos: Expected Outcome:Photovoltaic products are considered to be building-integrated, if they have been designed following the basic requirements for construction works in order to form and/or replace a construction product. If the integrated PV product is dismounted, it would have to be replaced by an appropriate conventional construction product. Building and infrastructure integrated PV can be a cost-effective, technologically proven solution to decarbonise buildings and infrastructure. Expected Outcome:Photovoltaic products are considered to be building-integrated, if they have been designed following the basic requirements for construction works in order to form and/or replace a construction product. If the integrated PV product is dismounted, it would have to be replaced by an appropriate conventional construction product. Building and infrastructure integrated PV can be a cost-effective, technologically proven solution to decarbonise buildings and infrastructure.
Do you want examples? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Financial Chapters: The chapters of financing expenses for this line are:
Personnel costs.
Expenses related to personnel working directly on the project are based on actual hours spent, based on company costs, and fixed ratios for certain employees, such as the company's owners.
Subcontracting costs.
Payments to external third parties to perform specific tasks that cannot be performed by the project beneficiaries.
Purchase costs.
They include the acquisition of equipment, amortization, material, licenses or other goods and services necessary for the execution of the project
Other cost categories.
Miscellaneous expenses such as financial costs, audit certificates or participation in events not covered by other categories
Indirect costs.
Overhead costs not directly assignable to the project (such as electricity, rent, or office space), calculated as a fixed 25% of eligible direct costs (excluding subcontracting).
Madurez tecnológica: The processing of this aid requires a minimum technological level in the project of TRL 6:. Se cuenta con prototipos piloto capaces de desarrollar todas las funciones necesarias dentro de un sistema determinado, habiendo superado pruebas de factibilidad en condiciones de operación o funcionamiento real. + info.
TRL esperado:

Characteristics of financing

Intensidad de la ayuda: Sólo fondo perdido + info
Lost Fund:
For the eligible budget, the intensity of the aid in the form of a lost fund may reach From a 70% up to a 100%.
The funding rate for IA projects is 70 % for profit-making legal entities and 100 % for non-profit legal entities. The funding rate for IA projects is 70 % for profit-making legal entities and 100 % for non-profit legal entities.
Guarantees:
does not require guarantees
No existen condiciones financieras para el beneficiario.

Additional information about the call

incentive effect: Esta ayuda no tiene efecto incentivador. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
non -competitive competitive Very competitive
We do not know the total budget of the line
minimis: Esta línea de financiación NO considera una “ayuda de minimis”. You can consult the regulations here.

other advantages

SME seal: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
HORIZON-CL5-2023-D3-01 PV integration in buildings and in infrastructure Expected Outcome:Photovoltaic products are considered to be building-integrated, if they have been designed following the basic requirements...
Sin info.
HORIZON-CL5-2023-D3-03-01 Increasing the efficiency of innovative static energy conversion devices for electricity and heat/cold generation
en consorcio: Expected Outcome:Projects are expected to develop further the harvesting of renewable energy in areas/conditions where other conversion syst...
Cerrada does 1 year | next call scheduled for the month of
HORIZON-CL5-2023-D3-03-08 Support to the SET Plan IWG on hydrogen
en consorcio: Expected Outcome:Project results are expected to contribute to the following outcomes: Organisational, logistic and secretarial support pro...
Cerrada does 1 year | next call scheduled for the month of
HORIZON-CL5-2023-D3-03-07 Digital solutions for defining synergies in international renewable energy value chains
en consorcio: Expected Outcome:Project results are expected to contribute to some of the following expected outcomes: Advance the European and global sci...
Cerrada does 1 year | next call scheduled for the month of
HORIZON-CL5-2023-D3-03-05 Creation of a standardised and open-source peer-to-peer energy sharing platform architecture for the energy sector
en consorcio: Expected Outcome:Project results are expected to contribute to all of the following expected outcomes: Develop an independent, EU-validated...
Cerrada does 1 year | next call scheduled for the month of
HORIZON-CL5-2023-D3-03-03 System approach for grid planning and upgrade in support of a dominant electric mobility (vehicles and vessels) using AI tools
en consorcio: Expected Outcome:Project results are expected to contribute of the following expected outcomes: AI-based prediction of most convenient loca...
Cerrada does 1 year | next call scheduled for the month of