Innovating Works

Temáticas obligatorias de los proyectos para la ayuda HORIZON-CL5-2024-D4-01-01

Temática principal:
The project aims to achieve low-disruptive renovation processes with prefabricated modules, reducing construction time to 1-2 days, lowering costs by 25%, minimizing dust and noise, enhancing occupant comfort, and improving building resilience and adaptability. The project aims to achieve low-disruptive renovation processes with prefabricated modules, reducing construction time to 1-2 days, lowering costs by 25%, minimizing dust and noise, enhancing occupant comfort, and improving building resilience and adaptability.
Energy Efficiency Construction and Renovation
RePowerEU
Energy efficient buildings
On-site construction
dwelling/building unit
conventional renovation processes
dust
noise
waste
occupancy comfort
Indoor Air Quality
Indoor Environmental Quality
biodiversity
adaptability
resilience
disruptive events
Low-disruptive renovation processes
prefabricated modules
energy-efficient renovation
NZEB performance levels
off-site manufacturing
on-site deployment
seamless integration
existing constructions
wall materials
balconies
overhangs
existing piping
building owners
tenants
building categories.
Low-disruptive Renovation Processes
Prefabricated Modules
Construction Time Reduction
Cost Reduction
Occupant Comfort
Building Resilience
Building Adaptability
Energy Efficient Buildings
dwelling/building unit
conventional renovation processes
dust
noise
waste
occupancy comfort
Indoor Air Quality
Indoor Environmental Quality
biodiversity
adaptability
resilience
disruptive events
Low-disruptive renovation processes
prefabricated modules
energy-efficient renovation
NZEB performance levels
off-site manufacturing
on-site deployment
seamless integration
existing constructions
wall materials
balconies
overhangs
existing piping
building owners
tenants
building categories
Dwelling/Building Unit
Conventional Renovation Processes
Dust
Noise
Waste
Biodiversity
Adaptability
Resilience
Disruptive Events
NZEB Performance Levels
Off-site Manufacturing
On-site Deployment
Seamless Integration
Existing Constructions
Wall Materials
Balconies
Overhangs
Existing Piping
Building Owners
Tenants
Building Categories
Energy Efficiency
Construction and Renovation