Innovating Works
HORIZON-CL5-2023-D3-02-10
HORIZON-CL5-2023-D3-02-10: Development of innovative power take-off and control systems for wave energy devices
Expected Outcome:Project results are expected to contribute to all of the following expected outcomes:
Sólo fondo perdido 0 €
European
This call is closed This line is already closed so you can't apply. It closed last day 05-09-2023.
An upcoming call for this aid is expected, the exact start date of call is not yet clear.
Luckily, we have achieved the list of financed projects!
Presentation: Consortium Consortium: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Minimum number of participants.
This aid finances Proyectos:

Expected Outcome:Project results are expected to contribute to all of the following expected outcomes:

Demonstrated increased performance and reliability of wave energy devices.Improved knowledge on how to operate wave energy devices, their availability, maintainability and survivability.Reduction of LCOE.Reinforced industrial supply chain in Europe. Scope:Power take-off (PTO) and control systems (including "prime mover" (waves to mechanical power) as well as the ancillary equipment like gearboxes, generators, and power electronics, power controllers, grid interfaces and other items) are key subsystems of wave energy converters. PTO and control systems can be improved to increase the efficiency of the whole converter, to increase reliability by controlling for instance the structuring health and power electronics, and to avoid extreme events that might compromise device survivability. Control systems dynamically adapt to and mitigate the forces of the continually changing ocean conditions. This can prevent damage during extreme events, contribute to increased performance and the viability of the technology. The manufacturing and testing of prototypes are rel... see more

Expected Outcome:Project results are expected to contribute to all of the following expected outcomes:

Demonstrated increased performance and reliability of wave energy devices.Improved knowledge on how to operate wave energy devices, their availability, maintainability and survivability.Reduction of LCOE.Reinforced industrial supply chain in Europe. Scope:Power take-off (PTO) and control systems (including "prime mover" (waves to mechanical power) as well as the ancillary equipment like gearboxes, generators, and power electronics, power controllers, grid interfaces and other items) are key subsystems of wave energy converters. PTO and control systems can be improved to increase the efficiency of the whole converter, to increase reliability by controlling for instance the structuring health and power electronics, and to avoid extreme events that might compromise device survivability. Control systems dynamically adapt to and mitigate the forces of the continually changing ocean conditions. This can prevent damage during extreme events, contribute to increased performance and the viability of the technology. The manufacturing and testing of prototypes are relatively costly, and it is imperative that data from the demonstration are available to avoid repeating early engineering mistakes. Validation of the innovative concepts is expected to be done in realistic environments at small scale for longer periods or by onshore testing and controlled lab testing. If validation is done onshore the project should demonstrate that they can make use of existing test rigs or develop a test rig for the project, which can be used after the project by other developers. Development and demonstration of the PTO technology should be combined with control strategies as their requirements are inherently coupled. In the validation it is expected that key performance indicators are used based on international recognized metrics

In the development of the PTO system the ‘circularity by design’ principle should be used.

see less

Temáticas Obligatorias del proyecto: Temática principal: Renewable energy sources - general

Consortium characteristics

Scope European : The aid is European, you can apply to this line any company that is part of the European Community.
Tipo y tamaño de organizaciones: The necessary consortium design for the processing of this aid needs:

characteristics of the Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Expected Outcome:Project results are expected to contribute to all of the following expected outcomes: Expected Outcome:Project results are expected to contribute to all of the following expected outcomes:
Do you want examples? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Financial Chapters: The chapters of financing expenses for this line are:
Personnel costs.
Expenses related to personnel working directly on the project are based on actual hours spent, based on company costs, and fixed ratios for certain employees, such as the company's owners.
Subcontracting costs.
Payments to external third parties to perform specific tasks that cannot be performed by the project beneficiaries.
Purchase costs.
They include the acquisition of equipment, amortization, material, licenses or other goods and services necessary for the execution of the project
Other cost categories.
Miscellaneous expenses such as financial costs, audit certificates or participation in events not covered by other categories
Indirect costs.
Overhead costs not directly assignable to the project (such as electricity, rent, or office space), calculated as a fixed 25% of eligible direct costs (excluding subcontracting).
Madurez tecnológica: The processing of this aid requires a minimum technological level in the project of TRL 4:. Los componentes que integran determinado proyecto de innovación han sido identificados y se busca establecer si dichos componentes individuales cuentan con las capacidades para actuar de manera integrada, funcionando conjuntamente en un sistema. + info.
TRL esperado:

Characteristics of financing

Intensidad de la ayuda: Sólo fondo perdido + info
Lost Fund:
0% 25% 50% 75% 100%
For the eligible budget, the intensity of the aid in the form of a lost fund may reach as minimum a 100%.
The funding rate for RIA projects is 100 % of the eligible costs for all types of organizations. The funding rate for RIA projects is 100 % of the eligible costs for all types of organizations.
Guarantees:
does not require guarantees
No existen condiciones financieras para el beneficiario.

Additional information about the call

incentive effect: Esta ayuda no tiene efecto incentivador. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
non -competitive competitive Very competitive
We do not know the total budget of the line
minimis: Esta línea de financiación NO considera una “ayuda de minimis”. You can consult the regulations here.

other advantages

SME seal: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
HORIZON-CL5-2023-D3-02 Development of innovative power take-off and control systems for wave energy devices Expected Outcome:Project results are expected to contribute to all of the following expected outcomes: Demonstrated increased performance a...
Sin info.
HORIZON-CL5-2023-D3-03-01 Increasing the efficiency of innovative static energy conversion devices for electricity and heat/cold generation
en consorcio: Expected Outcome:Projects are expected to develop further the harvesting of renewable energy in areas/conditions where other conversion syst...
Cerrada does 1 year | next call scheduled for the month of
HORIZON-CL5-2023-D3-03-08 Support to the SET Plan IWG on hydrogen
en consorcio: Expected Outcome:Project results are expected to contribute to the following outcomes: Organisational, logistic and secretarial support pro...
Cerrada does 1 year | next call scheduled for the month of
HORIZON-CL5-2023-D3-03-07 Digital solutions for defining synergies in international renewable energy value chains
en consorcio: Expected Outcome:Project results are expected to contribute to some of the following expected outcomes: Advance the European and global sci...
Cerrada does 1 year | next call scheduled for the month of
HORIZON-CL5-2023-D3-03-05 Creation of a standardised and open-source peer-to-peer energy sharing platform architecture for the energy sector
en consorcio: Expected Outcome:Project results are expected to contribute to all of the following expected outcomes: Develop an independent, EU-validated...
Cerrada does 1 year | next call scheduled for the month of
HORIZON-CL5-2023-D3-03-03 System approach for grid planning and upgrade in support of a dominant electric mobility (vehicles and vessels) using AI tools
en consorcio: Expected Outcome:Project results are expected to contribute of the following expected outcomes: AI-based prediction of most convenient loca...
Cerrada does 1 year | next call scheduled for the month of