Innovating Works
HORIZON-JU-ER-2023-01 FUTURE METRO SYSTEMS ExpectedOutcome:Metro lines are traditionally operated through a combination of planned levels of demand and of availability of rolling stoc...
Sin info.
HORIZON-ER-JU-2023-EXPLR-02 FUTURE METRO SYSTEMS
en consorcio: ExpectedOutcome:Metro lines are traditionally operated through a combination of planned levels of demand and of availability of rolling stoc...
Cerrada hace 9 meses
HORIZON-ER-JU-2023-EXPLR-06 DAC FLEET RETROFITTING AND RETROFIT CAPACITY PLAN
en consorcio: ExpectedOutcome:During the past years and within the scope of the S2R freight innovation pillar (IP5), rail stakeholders have been working o...
Cerrada hace 9 meses
HORIZON-ER-JU-2023-EXPLR-05 EXTENDING THE RAIL NETWORK OF PHDS
en consorcio: ExpectedOutcome:With this Research and Innovation Action, the Europe’s Rail Joint Undertaking intends further extend the rail research and i...
Cerrada hace 9 meses
HORIZON-ER-JU-2023-EXPLR-03 BIODIVERSITY
en consorcio: ExpectedOutcome:The Project stemming from this topic should deliver the following outcomes, considering rail as the backbone of the future m...
Cerrada hace 9 meses
HORIZON-ER-JU-2023-EXPLR-01 NOISE AND VIBRATIONS
en consorcio: ExpectedOutcome:Railway noise is still the main rail externality and according to the EEA’s Outlook to 2030 report, the number of people who...
Cerrada hace 9 meses
HORIZON-ER-JU-2023-EXPLR-04 DISRUPTIVE ASSETS MANAGEMENT SOLUTIONS, INCLUDING URBAN USE CASES
en consorcio: ExpectedOutcome:Building upon the work delivered by IP3 in S2R and other research and innovation activities, the Project stemming from this...
Cerrada hace 9 meses